MS-DEFCON 2:
Patch reliability is unclear. Unless you have an immediate, pressing need to install a specific patch, don't do it.
|
-
Microsoft pulls KB 2952664 and KB 2976978, likely in anticipation of today’s Patch Tuesday
Home › Forums › AskWoody blog › Microsoft pulls KB 2952664 and KB 2976978, likely in anticipation of today’s Patch Tuesday
Tagged: KB 2952664, KB 2976978
- This topic has 15 replies, 9 voices, and was last updated 3 years, 10 months ago.
Viewing 9 reply threads-
AuthorPosts
-
-
March 14, 2017 at 6:10 am #101034
woody
ManagerGünter Born has details on Borncity. Long and short of it, the two notorious Win7/8.1 snooping patches, KB 2952664 and KB 2976978, which were re-re-..
[See the full post at: Microsoft pulls KB 2952664 and KB 2976978, likely in anticipation of today’s Patch Tuesday] -
March 14, 2017 at 9:33 am #101061
PhotM
AskWoody PlusAs I reported on one other Post, about these 2 KB’s(the last one I believe) for me they were pulled early Sunday evening MDT. Usually that does not occur until Monday, if at ll. I was going to install them on my Main W 8.1 Pro Partition as I do not cherry pick Updates, I just test them first. My Test partition had it installed all week. I’d guess if they are going to do this so early, I will need to get “WSUS Offline Update” going more. Bandwidth is not an issue for me so I have only played a bit with it.
--------------------------------------
1. Tower Totals: 2xSSD ~512GB, 2xHHD 20 TB, Memory 32GB
SSDs: 6xOS Partitions, 2xW8.1 Main & Test, 2x10.0 Test, Pro, x64
CPU i7 2600 K, SandyBridge/CougarPoint, 4 cores, 8 Threads, 3.4 GHz
Graphics Radeon RX 580, RX 580 ONLY Over Clocked
More perishable2xMonitors Asus DVI, Sony 55" UHD TV HDMI
1. NUC 5i7 2cores, 4 Thread, Memory 8GB, 3.1 GHz, M2SSD 140GB
1xOS W8.1 Pro, NAS Dependent, Same Sony above.-----------------
-
March 14, 2017 at 10:21 am #101069
Pepsiboy
AskWoody LoungerWoody,
Great article. Thanks. IF, and I do mean IF these show up again in tomorrow mornings scan, they will get hidden again. And along with them I feel should follow the other 4 currently showing available for install. KB2992611, KB2973337, KB3042058, and KB3172605 appear to me to be unnecessary and unneeded. Please correct me it I am wrong.
Win7 x64 SP1
Dave -
March 14, 2017 at 11:02 am #101080
-
March 14, 2017 at 11:14 am #101088
Noel Carboni
AskWoody_MVPMakes one wonder…
Do Microsoft marketeers watch the web and instruct their technical minions to pull the patches out of the list when they see more than a certain amount of people talking negatively about telemetry / snooping, etc?
Are they hoping for a month when few people notice or comment, then just leave the privacy invasion advancement stuff in there to try to snag more folks who are remaining on older systems?
Do they just leave them available for the times between “patch Tuesdays” when folks aren’t looking as closely at what Microsoft is shepherding into their systems via the back door?
And I have, from time to time, wondered why they don’t just roll the telemetry/snooping work into the cumulative updates for older systems. It’s almost as if they’re somehow legally bound not to do so.
In any case, the dance is interesting to watch.
-Noel
-
March 14, 2017 at 11:29 am #101093
PKCano
ManagerFor several years MS has been staging updates this way. It’s like what they call “Preview” now, only they didn’t use the word before.
Patches show up in the optional list as unchecked “optional” updates. They sit there until sometime the Mon before patch Tues or early Tues. MS changes them to “recommended” or “critical” and they show up as checked in the “important” list when updates are released Tues.
This has been going on for a long time. I think people are just now noticing it because MS started labeling the Preview as such and setting it as an unchecked optional until the next Patch Tues.
2 users thanked author for this post.
-
-
March 14, 2017 at 11:28 am #101092
abbodi86
AskWoody_MVP-
March 14, 2017 at 11:54 am #101102
Noel Carboni
AskWoody_MVPOptional, pull, recommnded, repeat
nothing require any attention or articles
I might differ in that one has to pay attention to make sure the updates they don’t want (*cough* *KB2976978* *cough*) aren’t installed.
Any insight why they’re not just rolled into the cumulative blobs? Or are they after a time?
I’m not terribly worried about privacy intrusion in that I’ve blocked the pathways they can use to snoop. That being said, I dislike it when Microsoft “enhances” the OS only for THEIR benefit, as it uses MY resources. I did actually pay money for my disk space, RAM, CPUs, etc., and I’d like them all to be as available as possible for MY usage.
Though I strive to keep my system’s run-time form trim, as a rule I don’t delete parts of the OS, so that it remains serviceable. I just did a Properties on C:Windows… Lo and behold, look at what’s accumulated:
Almost a quarter million files in forty thousand plus folders, taking up 46 GB?!?
🙂
-Noel
Attachments:
You must be logged in to access attached files.
1 user thanked author for this post.
-
-
March 14, 2017 at 11:30 am #101095
AlexN
AskWoody LoungerNo patches as of 12:29PM EDT, March 14th, 2017. I do, however, have a *new* version of the INTEL thing, labeled “INTEL – System – 8/19/2016 12:00:00 AM – 10.1.2.80” which was released on March 11th and marked optional.
I am hiding it as of this posting.
Fortran, C++, R, Python, Java, Matlab, HTML, CSS, etc.... coding is fun!
A weatherman that can code-
March 14, 2017 at 11:36 am #101097
-
-
March 14, 2017 at 12:14 pm #101110
Noel Carboni
AskWoody_MVPOr December if you’re on Windows 8.1.
I thought of it as a nice opportunity to relax, and not worry about what Microsoft could break.
Here’s what I see available today:
And… Seen on the test system right after installation of the above during bootup, a pair of these:
Not to mention this:
I’m not sure the above mean anything’s specifically gone wrong because of the update, but they’re not typical. More testing is required.
-Noel
Attachments:
You must be logged in to access attached files.
-
March 14, 2017 at 1:34 pm #101162
Noel Carboni
AskWoody_MVPFYI, my installation of the Sphinx Windows Firewall Control product did not start properly on the above reboot after update installation either. Perhaps that was related to the errors logged.
However, a second reboot seems to have worked around the anomalous event log entries and firewall software startup failure. Now the event log sequence appears normal and the firewall software is working again.
Recommendation for Win 8.1 users: Consider doing a second reboot right after installing the Win 8.1 updates.
-Noel
-
-
March 14, 2017 at 12:26 pm #101123
Bill C.
AskWoody PlusOn Win7-64 Pro SP1, Group B. Just checked at 1:04PM EDT. It’s back!!! Optional and Recommended. KB Article ID: 2952664 – Last Review: Mar 7, 2017 – Revision: 12. WU shows published today.
I also got 3 security updates for Office 2010 (KB3178687), a Word, an Excel (KB 3178690), and an Office (KB3178688). Also the MSRT, a Silverlight security patch, and the March rollup.
1 user thanked author for this post.
-
March 14, 2017 at 1:38 pm #101166
Noel Carboni
AskWoody_MVP
-
-
AuthorPosts
Viewing 9 reply threads -
Welcome to our unique respite from the madness.
It's easy to post questions about Windows 10, Win8.1, Win7, Surface, Office, or browse through our Forums. Post anonymously or register for greater privileges. Keep it civil, please: Decorous Lounge rules strictly enforced. Questions? Contact Customer Support.

Plus Membership
Donations from Plus members keep this site going. You can identify the people who support AskWoody by the Plus badge on their avatars.
AskWoody Plus members not only get access to all of the contents of this site -- including Susan Bradley's frequently updated Patch Watch listing -- they also receive weekly AskWoody Plus Newsletters (formerly Windows Secrets Newsletter) and AskWoody Plus Alerts, emails when there are important breaking developments. Click here for details and to sign up.
Search The Lounge
Recent Replies
desertdad on Windows 10 Latest Patch: KB 4598242
1 hour, 1 minute agocyberSAR on Hasta la vista, TeamViewer Free
1 hour, 22 minutes agoanonymous on Google threatens to remove search engine from Australia
1 hour, 25 minutes agoBob99 on KB4023057 while on Win10-2004
2 hours, 15 minutes agoBob99 on Seriously, MBAM?
2 hours, 34 minutes agoBob99 on Seriously, MBAM?
2 hours, 37 minutes agoBob99 on Susan recommending version 2004
2 hours, 44 minutes agoOscarCP on Google threatens to remove search engine from Australia
2 hours, 49 minutes agoSusan Bradley on This should be the best patching experience
3 hours, 10 minutes agoanonymous on This should be the best patching experience
3 hours, 11 minutes agoOscarCP on Giving you the choice
3 hours, 53 minutes agorick41 on Giving you the choice
3 hours, 54 minutes agocyberSAR on Seriously, MBAM?
4 hours, 3 minutes agoOscarCP on Giving you the choice
4 hours, 6 minutes agoSusan Bradley on Lost Post
4 hours, 12 minutes agoSusan Bradley on Giving you the choice
4 hours, 13 minutes agogsel on imovie problems in osx 10.6.8
4 hours, 15 minutes agorick41 on Giving you the choice
4 hours, 19 minutes agoanonymous on MS-DEFCON 2 – Get ready for January updates
4 hours, 32 minutes agoFrances McKenna on Time to adapt while acknowledging the past
4 hours, 34 minutes agoSusan Bradley on Giving you the choice
4 hours, 34 minutes agoCybertooth on Giving you the choice
4 hours, 47 minutes agoCADesertRat on MS Shared Experience warning
5 hours, 32 minutes agolikescats on Files don’t copy from Win7 HDD to Win10 computer
5 hours, 55 minutes agoBundaburra on Google threatens to remove search engine from Australia
6 hours, 5 minutes agoSteveTree on This should be the best patching experience
6 hours, 17 minutes agomn-- on Files don’t copy from Win7 HDD to Win10 computer
6 hours, 18 minutes agoLicAC on Windows Defender – yes or no?
6 hours, 40 minutes agoBen Myers on SSD vs. SATA Drives
7 hours, 25 minutes agoKirsty on Google threatens to remove search engine from Australia
9 hours, 15 minutes ago
Recent Topics
-
Slow file copy
38 minutes ago
-
Do we need Java?
47 minutes ago
-
Windows 10 version changes
2 hours, 1 minute ago
-
Lost Post
4 hours, 13 minutes ago
-
Hasta la vista, TeamViewer Free
1 hour, 23 minutes ago
-
Files don’t copy from Win7 HDD to Win10 computer
5 hours, 56 minutes ago
-
Does the HP Spectre Notebook (2016 model) have a removable wireless LAN Card?
19 hours, 24 minutes ago
-
Windows 10 2004 and Intel Ethernet Problem Solving
7 hours, 28 minutes ago
-
KB4023057 while on Win10-2004
2 hours, 16 minutes ago
-
MS Shared Experience warning
5 hours, 33 minutes ago
-
Google threatens to remove search engine from Australia
1 hour, 26 minutes ago
-
macOS Catalina running on iPad Pro 2020
9 hours, 28 minutes ago
-
How to check if someone else accessed your Google account
20 hours, 50 minutes ago
-
This should be the best patching experience
3 hours, 10 minutes ago
-
Windows 10 Insider build 19042.782 (20H2) released to Beta & Release Preview
1 day, 2 hours ago
-
Browser Settings Block Linux Mint Downloads
1 day, 2 hours ago
-
Windows 10 Insider Preview build 20296 released to DEV Channel
1 day, 9 hours ago
-
Google Analytics Notice
1 day, 10 hours ago
-
Beeper combines 15 chatting apps
1 day, 5 hours ago
-
File Explorer cannot see external 2Tb drive in full
1 day, 13 hours ago
-
Office 2010 updates.
13 hours, 7 minutes ago
-
What is ‘Meet Now’
1 day, 13 hours ago
-
Linux is now completely usable on the Mac mini M1
2 days, 9 hours ago
-
User Feed Synchronization – Disable/Delete Task?
1 day, 10 hours ago
-
AV Alert from JetAudio Plus
2 days, 11 hours ago
-
System Restore Stopped Working
1 day, 9 hours ago
-
Malwarebytes was targeted by SolarWinds hackers too
2 days, 21 hours ago
-
So I opened up an HP and where’s the hard drive?
21 hours, 30 minutes ago
-
Which version of MS Office should we buy and where can we get it?
2 days ago
-
Fiber optic not available; options please
2 days, 5 hours ago
Search for Topics
Recent blog posts
Key Links
Copyright © 2004 – 2021 AskWoody Tech LLC. All rights reserved.